Current site: Peikko United Kingdom. Do you want to change country or language?
Maru Ehitus AS and DMT Insenerid OÜ signed a general construction contract for the construction of the DMT office building, located at Kadaka pst 112, Tallinn. The office building will be equipped with office space for DMT Insenerid OÜ and additional space for renting out, as well as a gym with a sauna and a restaurant.
Peikko’s PETRA® Slab Hangers enabled fast and secure connections between prefabricated elements, eliminating the need for temporary propping and reducing construction time.
The system ensured precise alignment, optimal load distribution, and enhanced safety, allowing the project to stay on schedule and meet its high architectural and structural standards. Peikko’s tailored solutions were key to achieving a faster, safer, and more efficient build.
Vadim Saija